Gas-fired Power Plants

Our company carried out the electric implementation works of the biogas plant.

Győr Dump Landfill Gas-Fired Gas Engine.

Preparation of the electric and construction plans of the planned gas engine, complete permitting process until building permit acquisition, implementation.

Operation of the MV system of the 9MW power Salgótarján gas engine power plant.

Wind Power Plants

Our company provides the operation and maintenance tasks of the Törökszentmiklós wind power plant. We undertake the periodical control check of the bolt connection of wind power plants with hydraulic torque wranch.

Our company provides the operational and maintetnance tasks of the wind park.

  Our company provides the operational and maintenance tasks of the Bőny 26 MW wind park. We undertake the setting and adjustment of the concentricity of axis of the gearbox and generator of wind turbines.
Our company provides the operational and maintetnance tasks of the Pápakovácsi wind park. Our team undertakes the necessary diagnostic measurements of wind parks, such as the vibration measurement of the gearbox and generator.

Our company provides the operational and maintetnance tasks of the Jánossomorja wind park.

Our company provides the operational and maintetnance tasks of the wind park.

Hydro Power Plants

Preparation and approval of connection design and connection plans for the connection of a small hydropower power plant to the electricity grid.

Implementation design of the hydro power plant, implementation and installation of the MV switchgear and the related 2 pcs 1250 kVA, 22/0,42 kV transformer. In July 2013 the installation of the MV equipments of the plant has started.

Building Electricity

Electric implementation design for the elelctric reconstruction. Expansion of the 22 kV MV equipment, installation of 2,5 MVA 22/0,42 kV transformer with the related 4000 A, 0,4 kV distributor. Relocation of the 800 A power rails and electric supply of the equipments placed on site.

Design of the electric implementation of Győr, 67. Ady Endre Str. new apartment house.

Design of the permitting, implementation and 22kV cabling right licence of the electric system.

Design of the climate system. Electric implementation design. Lighting system reconstruction.

Design of the lightning protection.

Electric permitting  and implementation design.

Design of lightning protection.

Electric permitting and implementation design.

Electric permitting, implementation and photovoltaic system design.

Electric permitting, implementation and photovoltaic system design.

Electric permitting and implementation design of the four-store building.

LV/MV/HV Networks

Installation of the Győr, Csóka street transformer station.

Design of the 20kV electric supply of the planned truck park, design and implementation of the 20kV airline and earth cable layout, with the public lighting design of the related truck park, access roads, intersections, and motorway exit lane. Design of the 400kV power line crossing points.

Public Lighting

The municipality of Győrzámoly Village deciced to carry out the reconstruction of the its public lighting within the frame of “KEOP-2014-5.5.0/K14-2014-0064 – The Energy Saving Reconstruction of Public Lighting” tender call in order to improve enery efficiency by the assembly of new LED lights. Our company was contracted for the implementation works of the reconstruction. The scope of the design included the already existing public lighting system of Győrzámoly village within the Győr Region of E.ON Power Supply Company.

The improvement included the exchange of 289 pcs lighting units within the territory of Győrzámoly village. The former lighting units were changed to SLBT type lighting units, additional 5 pcs lighting units were re-assembled with 13W LED bulbs while also undergoing maintenance.

The municipality of Hédervár village deciced to carry out the reconstruction of the its public lighting within the frame of “KEOP-2014-5.5.0/K14-2014-0064 – The Energy Saving Reconstruction of Public Lighting” tender call in order to improve enery efficiency by the assembly of new LED lights.

The improvement included the exchange of 179 pcs lighting units within the territory of Hédervár village. 100 pcs Altra 36 W lighting units and 80 pcs sodium type ZAfir 70W lighting units were changed. The former lighting units were changed to SLBT type lighting units.

Design, permitting, and implementation of the public lighting update.

Design, permitting, and implementation of the public lighting update.

Design and permitting of the public lighting update.

Update of Győrújfalu village public lighting to LED lamps. Design and implementation.