If you want a solar system (Small Household Power Plant – HMKE), you have to go through two basic processes – either partly alone or with the help of a competent service provider: 1: Authorization, 2: Installation (and then connection to the system).

Without them, a solar producer cannot be put into operation today. Most solar installation companies will help you go through these steps. We’ve written down what you need to do if you start HMKE licensing and solar system installation.

1: Authorization

Here you can see the full HMKE licensing process. If you want to get started, you will find all the necessary materials in the downloadable documents. If you don’t want to deal with these, simply fill out a power of attorney and we’ll take care of the whole process for you in one step.

Claim
 

 up to 1-2 days
 
Submit the HMKE claimant to your service provider about your planned system.

Who does
  the builder of the system - You
 

Technical inspection
 

  up to 30 days
 
Your service provider will examine whether the planned system is appropriate and feasible at the site.
 
Who does
  your service provider
 

Planning, starting licensing


up to 90 days
 
Preparation and licensing of the technical plans of the actual system.
 

  Who does 
designer or solar company
 

Security, high yields -
all you have
to do is
install

2: Telepítés

A telepítés azután kezdődhet el, hogy a szolgáltató a Terv vizsgálat során jóváhagyta a fejleszteni kívánt rendszerre beadott összes dokumentumot. Ezután 180 nap áll az Ön rendelkezésére, hogy az engedélyeztetett termelőt kiépítse. Ha lecsússza ezt az időpontot, újra kell kezdenie az Igénybejelentéstől.

Plan examination

  up to 1-2 days
 
Your service provider will examine whether the planned system is appropriate and feasible at the site.
 
 
Who does
  az Ön szolgáltatója
 

Installation

  up to 180 days
 
It installs a licensed system designed for your capabilities. This is 1-10 days depending on demand.
 
 
Who does
  solar company
 

System connection

 up to 15 days + disembarkation
 
After the system is ready to be reported, the service provider will perform the necessary meter replacement / parameterization.
It can then be commissioned.
 
Who does  your service provider
 

0 forint
account,
secure future, risk-free investment

Documents, useful links for HMKE licensing

What do we prefer for you?

You don’t have to deal with the whole licensing if you build your solar system with us. Simply download this power of attorney, complete it, print it out, and send it to us signed. We do the rest.

A honlap további használatához a sütik használatát el kell fogadni. További információ

A süti beállítások ennél a honlapnál engedélyezett a legjobb felhasználói élmény érdekében. Amennyiben a beállítás változtatása nélkül kerül sor a honlap használatára, vagy az "Elfogadás" gombra történik kattintás, azzal a felhasználó elfogadja a sütik használatát.

Bezárás